Saturday, October 6, 2012
Pin-Up order
We will begin at 1pm and may go as late as 6pm, so please make arrangements to stay the entire time. Please pin-up in this order in the main hall outside the entrance to the TTU classrooms. Each student has 10 minutes.
1. Josh
2. Julio
3. Daniela
4. Luis
5-8 Memo's class
9. Aldo
10. Judah
11. Rose
12. Raul
13-16 Memo's class
17. Aharon
18. Carla
19. David
20. Ivan
21-24 Memo's class
Thursday, October 4, 2012
For Friday, Oct. 5 and Pin-Up on Monday Oct. 8
Tomorrow all students are expected to attend the AIAS meeting at 1pm. Studio will begin at 2pm. We will have desk crits with your in process models and drawings of the required material below.
Pin-Up Requirements:
1 program/circulation organization diagram
list of total parking spaces required, bathrooms, quantity of ada bathrooms and parking spaces, and frequency of exits/fire stairs
1/32" plans for each level with a key noting total square footage for each program type
1/16" transverse sections at 3 locations: 120' ground, 120' spanning horizontally and 120' spanning vertically
1/32" model- chip board = program, white = circulation
Pin-Up Requirements:
1 program/circulation organization diagram
list of total parking spaces required, bathrooms, quantity of ada bathrooms and parking spaces, and frequency of exits/fire stairs
1/32" plans for each level with a key noting total square footage for each program type
1/16" transverse sections at 3 locations: 120' ground, 120' spanning horizontally and 120' spanning vertically
1/32" model- chip board = program, white = circulation
Sunday, September 30, 2012
For Monday, Oct. 1
Tomorrow we will begin with an ADA lecture followed by desk crits.
1- 1/16" or 1/32" plan for each level
1- 1/16" transverse section (not an elevation)
1 1/32" organizational model- model circulation (vehicle and pedestrian) in white and program with chip board
1- 1/16" or 1/32" plan for each level
1- 1/16" transverse section (not an elevation)
1 1/32" organizational model- model circulation (vehicle and pedestrian) in white and program with chip board
Tuesday, September 25, 2012
For Wednesday, Sept. 26
1- 1/16" plan for each level
1- 1/16" transverse section (not an elevation)
1 1/32" organizational model- model circulation (vehicle and pedestrian) in white and program with chip board
Program list and square footage
*if you did not submit a list to me yesterday with sq. ft. designated for each program (not just a list of program) please re-do this exercise
All drawings must be printed at above scale.
1- 1/16" transverse section (not an elevation)
1 1/32" organizational model- model circulation (vehicle and pedestrian) in white and program with chip board
Program list and square footage
*if you did not submit a list to me yesterday with sq. ft. designated for each program (not just a list of program) please re-do this exercise
All drawings must be printed at above scale.
Sunday, September 23, 2012
For Monday, Sept. 24
Everyone needs to finalize program type and square footage for program.
60,000 sq. ft. -vehicle lanes and passport control/checkpoint
60,000 sq. ft. -park and recreation with 30% (20,000 sq. ft) dedicated to circulation
As discussed on Friday the park and recreation program has been left open ended and I have provided a variety of program case studies as examples. Some of you may choose to focus on a botanical garden, landscape and water remediation, sports recreation (soccer, skating, basketball, volleyball, playing fields, running paths, etc), art/sculpture park, urban gardening/farming, outdoor entertainment and performance space or atmospheric conditions of water, air sun, and earth. You can make it highly specific or offer a wide range of program types. Take a position on what a international bridge in the future can be – this new bridge type has the opportunity to change the conditions of a border crossing. If you are struggling to make decisions or have questions please let me know immediately.
By Monday at 4pm please email a list of program and dedicated square footage and one paragraph summary stating what your program is and what it means to a bridge which in the past only allowed for vehicle and pedestrian traffic.
Continue working through how you organize program and circulation via physical models at 1/32"=1' scale. Requirements for Wednesday's class meeting will relate to these physical models and the translation into plan and section diagrams.
60,000 sq. ft. -vehicle lanes and passport control/checkpoint
60,000 sq. ft. -park and recreation with 30% (20,000 sq. ft) dedicated to circulation
As discussed on Friday the park and recreation program has been left open ended and I have provided a variety of program case studies as examples. Some of you may choose to focus on a botanical garden, landscape and water remediation, sports recreation (soccer, skating, basketball, volleyball, playing fields, running paths, etc), art/sculpture park, urban gardening/farming, outdoor entertainment and performance space or atmospheric conditions of water, air sun, and earth. You can make it highly specific or offer a wide range of program types. Take a position on what a international bridge in the future can be – this new bridge type has the opportunity to change the conditions of a border crossing. If you are struggling to make decisions or have questions please let me know immediately.
By Monday at 4pm please email a list of program and dedicated square footage and one paragraph summary stating what your program is and what it means to a bridge which in the past only allowed for vehicle and pedestrian traffic.
Continue working through how you organize program and circulation via physical models at 1/32"=1' scale. Requirements for Wednesday's class meeting will relate to these physical models and the translation into plan and section diagrams.
Thursday, September 20, 2012
Desk crits tomorrow
Tomorrow is not a formal pin-up. You will pin-up your work and talk with me individually. Note: plans should be a 1/16"=1' scale, sections at 1/4". Sorry for the previous typo.
Tuesday, September 18, 2012
For Wedneday, Sept. 19 and Friday, Sept. 21
Start with measured drawings, preferably in CAD. Hand drawing is only acceptable if you are truly drafting, with a mayline and proper drafting tools. Develop in plan the entire length of bridge. Work through the dimensions of vehicle lanes, pedestrian paths and typical dimensions for program. Explore the spatial relationships between these uses.
Wednesday, Sept 19
at 4pm email me a screen shot or a pdf of your in process plan.
Friday, Sept 21
1- 1/4"=1' plan
1- 1/4"=1' section
1 plan diagram demonstrating the relationship between program and circulation
Look at the case studies listed on the right.
Wednesday, Sept 19
at 4pm email me a screen shot or a pdf of your in process plan.
Friday, Sept 21
1- 1/4"=1' plan
1- 1/4"=1' section
1 plan diagram demonstrating the relationship between program and circulation
Look at the case studies listed on the right.
Subscribe to:
Posts (Atom)